How to perform safe debugging of Pipe Mill



Connect the power line of the Pipe Mill to the power supply specified by the machine, and jog the motor to observe the direction of rotation. The direction of the motor should be the same as the direction of the labeled arrow on the motor or turn on the power switch after the line is connected.

Detailed installation and commissioning of Pipe Mill:

1. Handling: The Pipe Mill should be handled by a forklift.
Pipe Mill
2. Installation: The machine should be fixed horizontally on a stable foundation and grounded.

3. Fill the oil: Open the rear side cover of the chassis and add 56 liters of No. 46 anti-wear hydraulic oil to the fuel tank.

4. Power on: Connect the power line of Pipe Mill to the power supply specified by the machine, and jog the motor to observe the direction of rotation. The direction of the motor should be the same as the direction of the labeled arrow on the motor or turn on the power switch after connecting the line. Action, if the mold opening is increased, the motor will rotate in the correct direction. If the machine does not move, you need to reverse any two of the three fire lines.

5. Pressure adjustment: The pressure of the machine system is 31.5MPa, which is adjusted by the relief valve. Adjust the pressure clockwise to increase and counterclockwise to decrease the pressure. (The pressure has been adjusted at the factory. If you need to adjust the pressure of the relief valve, it is strictly prohibited to use this equipment over 31.5MPa)